Here are some projects that Pay Dirt LLC has completed
Award-Winning Restoration Built by Pay Dirt, LLC - Pay Dirt excavated roughly six to seven feet of accumulated sediment and debris from the lake bottom to restore storage capacity, rebuilt the failing
The hydrologic and hydraulic analyses of Valentine Creek revealed that water quality and water quantity control could be met with a retrofit design. This included the construction of a forebay...
Annapolis Harbour Center Pond modifications included excavating the bottom of the existing pond to provide additional storage and includes a large wet pool, two forebays at the inlets, a wetland...
The Broad Creek/ Health Department Gully SPSC Restoration project was designed to restore stability and function to a 750 LF ephemeral gully that flows to the East Branch of Broad Creek...
The Shipley's Choice Dam was a 20 ft high earthen embankment constructed in 1980 to create an instream stormwater management pond for the Shipley's Choice subdivision. In 2006, an enlarged wet area..